A major fire and explosion struck the Amur Gas Chemical Complex (AGCC) in Russia's Amur Region on August 25, 2026, resulting in casualties and injuries among workers during testing.

Project Overview

Partnership: Joint venture between Russia's SIBUR (60%) and China's Sinopec (40%).

Budget: Total investment exceeds $10 billion.

Location: Near Svobodny, close to the Russian-Chinese border.

Purpose: Designed to process ethane and liquefied gases to produce up to 2.7 million tonnes of polyethylene and polypropylene annually.

August 2026 Incident

Event: An explosion and subsequent fire broke out at the facility's pyrolysis unit.
Status: The plant was undergoing commissioning and testing work ahead of commercial operations.
Casualties: According to reports, a Chinese contractor was killed and over 100 workers were injured in the accident.
Cause: Authorities and company officials are currently investigating the cause of the blaze.


https://www.reddit.com/r/UkraineWarVideoReport/comments/1vxxn6v/amur_new_russochinesee_petrochemical_facility/
 Re: cinani maji mrzenicko - v rusku
Autor: MedaBeda ++++
Datum: 25. 08. 2026 17:16:01

The facility is designed to process ethane and liquefied gases supplied by the nearby Amur Gas Processing Plant run by Gazprom. The raw materials will be used to produce polyethylene and polypropylene.

The complex is expected to have an annual production capacity of up to 2.7 million tonnes of polymers. The facility was intended to become an important link in supplying products to Asian markets while bypassing Western sanctions.
 Re: cinani maji mrzenicko - v rusku
Autor: MedaBeda ++++
Datum: 25. 08. 2026 17:18:58

https://www.linkedin.com/pulse/amur-gas-chemical-complex-navigating-technology-nck9f

"The Amur Gas Chemical Complex (Amur GCC) exemplifies the intricate balance between technological ambition and geopolitical realities. Originally designed to become the world’s largest polymer production site, the project has faced significant delays due to shifts in technology licensing dynamics, even as its core infrastructure advances.

The Amur GCC Project

Amur GCC stands as one of the most ambitious petrochemical undertakings in Russia’s recent history and a flagship of Russian-Chinese industrial cooperation. Located near Svobodny in the Amur region of Russia’s Far East, the project is a joint venture between SIBUR, Russia’s largest petrochemical company, holding a 60% stake, and China’s Sinopec, which owns the remaining 40%. When completed, Amur GCC will be among the world’s largest producers of base polymers, with a design capacity of 2.7 million tonnes per year—2.3 million tonnes of polyethylene and 400,000 tonnes of polypropylene.

The complex is integrated with the broader Amur gas processing and gas chemical cluster, ensuring direct feedstock supply via pipelines.

Gazprom’s Amur Gas Processing Plant (Amur GPP), which processes natural gas from East Siberian fields, will supply the primary feedstock to Amur GCC: ethane (up to 2 million t/y), and LPG (propane/butane, ~1.1 million t/y).

Steam Cracker and Downstream Progress

At the heart of the complex lies its 2.3 million t/y ethylene plant, supplied and partially engineered by Linde before the German firm’s confirmed withdrawal in 2022. Linde’s contributions included delivering critical components like the 1,500-ton quench tower, transported from South Korea to the remote Amur site—a logistical triumph showcased in earlier project updates.

By January 2024, SIBUR released a progress video on AGCC status update as of December 2023, confirming that polyethylene (PE) and polypropylene (PP) production units were being deployed as originally planned. The footage shows equipment installation for these downstream facilities, suggesting that proprietary technologies from Western licensors—Univation (Unipol PE gas-phase plants), ChevronPhillips Chemical (PE slurry process, undefined if MarTECH Single Loop or Advanced Dual Loop), and LyondellBasell (Spheripol PP Technology)—remain integral to the project. This indicates that either licensing agreements persisted post-2022 or SIBUR/Sinopec retained rights to use the technologies despite licensors’ reduced involvement."

Well now it has faced significant delays due to being a bit burnt.

--------------

Amur GCC was to have been built with European companies like Linde and Technimont participating. Some of the equipment, particularly the pyrolysis unit, was manufactured, though the companies exited the project in 2022.